clean-energy-solutions


Case Study 1 : Reverse Air Bag House: Premature bag failure

Customer: Aswathi Industries Limited, Mumbai

Objective: Reduce premature bag failure

Approach:

  • Test data measurement on plant site
  • Design changes to address failure issue

 

Conclusion:

Improper mixing for Ram Mill off case was causing air temperatures higher than permissible limit at bag inlet.

Recommendation:

Baffles were added to improve mixing with no impact on  pressure drop